How to prep subfloor for wood flooring?
I’ve installed prefinished wood flooring before but the kitchen has ceramic tile glued to 1/4″ plywood, which is then (I assume) glued and nailed to the original sub floor. I need to remove the tile and 1/4″ plywood so I can put our new wood flooring on the original subfloor. What is the best way to do this? I was planning on using a hammer and chisel but is there a specialized tool i can use?
Not sure there is a specialized tool to use, but in this case I would suggest something quick and dirty. Bang it out and move on with the project. If you wait around to find the right tool, you often times pay to much for it (purchase or rental) and it would just be quicker if you did it manually.
There are exceptions, but in this case you seem to be on the right track. I would use a pry-bar and a hammer and start in one corner and attempt to take up the 1/4″ ply with the tile on top.